  1. Active Construction

    1. Central Campus

      1. Humanities Utility Relocation – Partial Sidewalk Closure

        Location: Sidewalk between CERIA and the Arts Building
        Dates: Tuesday, September 8 – Tuesday, September 29, 2026

        Utility repair work will take place along the walkway between CERIA and the Arts Building as part of the Humanities Utility Relocation Project.

        Construction fencing will block access to the affected sidewalk section. A pedestrian pathway will be maintained throughout construction, allowing continued access through the area.

        Please use caution and follow posted signage when traveling near the construction area.