      1. PN-88 HVAC Replacement

        The HVAC supporting the main office areas within PN-88 has exceeded life expectancy. An aged chiller has been temporarily installed to support a minimal heat load in the building. A Roof Top Unit (RTU) based system will be installed with heating and cooling capacity and the old hot/cold water system will be removed.

        The 1st floor is expected to complete by 2/28/25.