University of Colorado Boulder
Search
Table of Contents
Locations
Archive
Dec. 2022 - Completed
SEEL building
SEEL CAD drawings
SEEL1: add corridor to SEEC
SEEL1: add exterior room 172A
SEEL1: add room 167B
SEEL1: change 171 to 171B
SEEL1: continue wall bottom right 140A
SEEL1: continue wall bottom right 184A
SEEL1: move 171 to new room
SEEL1: remove door, top of 167
SEEL1: update area, new layout, rooms
SEEL1: update entire area
SEEL2: add door top of 214
SEEL2: add door top of 256
SEEL2: increase size of 277
SEEL2: remove inner short walls, change right wall to dotted line
SEEL2: remove wall inside room 261A
SEEL3: add room 314BA
SEEL3: change label 373 to 375A
SEEL3: change label 373A ro 375
SEEL3: change tan background to white
SEEL3: change tan background to white, remove label 302
SEEL3: decrease stairs area, see level 2
SEEL3: increase area of 314C, remove 316
SEEL3: update area
SEEL3: update area
SEEL3: update area