University of Colorado Boulder
Search
Table of Contents
Locations
Archive
Dec. 2022 - Completed
SEEC building
SEEC CAD drawings
SEEC1: add doorway
SEEC1: add wall right of S102
SEEC1: change label 184A to N184A
SEEC1: change tan background to white
SEEC1: change tan background to white
SEEC1: change wall to dotted line
SEEC1: change women's icon to toilet icon
SEEC1: fix double wall
SEEC1: increase N140 tan background, add wall, dotted lines
SEEC1: remove S139 label and change tan background to white
SEEC1: remove walls, add dotted lines or nothing
SEEC2: add C260A, tan background, dotted line
SEEC2: add dotted line between S269 and S277
SEEC2: add dotted line bottom of C242
SEEC2: add label 204
SEEC2: add tan background N200
SEEC2: add wall between C227 and C228
SEEC2: add wall, left of N236
SEEC2: change label NN247 to N247
SEEC2: change tan background to white
SEEC2: change tan background to white
SEEC2: change tan background to white
SEEC2: change tan background to white
SEEC2: change tan background to white
SEEC2: change tan background to white
SEEC2: expand N231
SEEC2: fix double line
SEEC2: reduce area of N249, add N241D, walls, doors
SEEC2: remove top wall of stairs, center icon
SEEC2: update are, new rooms, labels
SEEC3: change tan background to white
SEEC3: change tan background to white
SEEC3: update entire area