Completed Updates - Oct 2022
CASE building
CASE1: E130 now has multiple rooms, see CAD
CASE1: change E112 to E118
CASE1: change E118 to E112
CASE1B: change W1B08 to W1B09
CASE1B: change W1B111 to W1B11 and add doorway
CASE2: W210 area completely different, see CAD
CASE2: add doorway top right of E240
CASE2: add dotted line and tan background E211
CASE2: add label E212B and tan background
CASE2: add label E263
CASE2: add label E265
CASE2: add rooms W220A and W220B
CASE2: add tan background E212A
CASE2: add tan background and dotted line at bottom of E291
CASE2: add tan background and dotted line at top of E251
CASE2: add tan background, dotted lines E216
CASE2: remove label and make background white
CASE2: remove toilet icon, change background to tan, add label E261
CASE2B: change B02E to 2B76
CASE2B: change label from B00A to 2B53
CASE2B: update arrows as on CAD
CASE3: E330 area completely different, see CAD
CASE3: add dotted line bottom of W322
CASE3: add dotted line, tan background E311
CASE3: adjust bathroom without x area
CASE3: area in E390 and E380 completely different, see CAD
CASE3: area of W360 completely different, see CAD
CASE4: add doorway on right of E452
CASE4: add dotted line and tan background E411
CASE4: add dotted line between E460 and E430
CASE4: add dotted line separating E480 from E460
CASE4: add label E319, tan background, dotted lines
CASE4: add label E422B and wall
CASE4: change tan background to white
CASE4: change white background to tan W410
CASE: CAD drawing
CASe4: add label W450A and tan background