      Date Constructed:

      The original field house was constructed in 1963 and was closed for major renovations in May 2007. The ribbon cutting for the renovated field house was held on October 19, 2007.

      Historical Info:

      Construction in 2007 of the new $1.2 million, 4,238 square-foot facility located across from Brooks Baseball Field was made possible by gifts from Herbert (class of 1953) and Sylvia Fisher (class of 1950), Dr. William P. Nixon, Jr. and Bruce Cavenaugh (class of 1973).

      Current Usage:
      •  The first floor of the new Fisher Field House is anchored by a 600-square-foot locker area.
      • The second level has a 350-square-foot team meeting room, offices for baseball coaches, a study room with computer access and equipment area.