Bike path between Visual Arts and Chemistry closed
The adjacent pedestrian pathway remains open.
The detention pond between the pedestrian and bike lanes is to be regraded to allow for proper drainage. This will require equipment to be onsite that will be staged directly adjacent on the bike path.
Project closure: 9/24
Project contact: Tony Rojewski, Facilities Management, 970-657-4665
Website information: https://www.fm.colostate.edu/outages_notifications/