Colorado State University

Table of Contents

Locations

  1. Construction

    1. Road and Sidewalk Closures

      1. Pickett Equine Center Drive Lane

        Parking lot at B.W. Pickett Equine Center closed

        Dates: June 25, 6 p.m. - June 26, 6 p.m. AND July 6, 6 p.m. - July 9, 6 p.m.

        Reason for outage:  Conducting Routine Maintenance (Crack Filling/Seal Coating/Repainting) 

        This work should not disrupt operations since there is a concrete road for buses and parking spaces on the south side of the building can be used.

        There will be a second closure like this on July 6th for three days to seal coat and paint.

        Contact: (Transportation) Brian Taylor, 970-988-4175; Sean McGuirk, 970-286-5063