Colorado State University

Table of Contents

Locations

  1. Construction

    1. Under Construction

      1. Fire lane btwn. Allison and Scott Bio close

        Fire lane and pedestrian route between Allison Hall and Scott Bioengineering Building closed

        Dates: Sept. 21 – Oct. 2

        The fire lane between these buildings will be closed. Use the sidewalk immediately west of the Scott Bioengineering Building as a pedestrian detour route.

        Contact: (Facilities Management) Sarah Maloney, 970-657-1064